Steve’s Boat Building An amateur’s attempt to build a strip plank dinghy

This is the hull with the fibre-glass and epoxy, peel ply removed. The keel has been fitted, and the keel band polished and (temporarily) fitted.

View of the hull after sanding and two coats of two-pack Epifanes varnish. Only 7 coats to go!